When the temple of Radha Rasabihari in the Juhu section of Mumbai was conceived, a temporary structure was erected. The owner of the land bribed local police to demolish the shrine. The law was that any building would have to be built or rebuilt there within one week. A contractor named Mr. Sethi and his group of builders re-erected the temporary temple in a matter of days. Mr. Sethi sat at the site with a loaded shotgun at his side to insure the construction was completed on time and with no interference.
Opening of Mumbai